Project Overview
Neobio Science and Technology Museum (Shanghai Pavilion) is a diversified children's playground. We firstly set the color temperature at 4000K, which is in line with the overall simple and bright decoration style, and secondly we set the overall illumination at a high level, and most of the areas have a relatively uniform light distribution, which not only can ensure the safety of children playing, but also can make them have a more excited state.
Project Commissioner
Hangzhou Donghao Lighting Engineering Co.
Project Creator
Hangzhou Donghao Lighting Engineering Co.
Project Brief
In some special areas we also have different arrangements, the second floor multifunctional dining area, we divided the lamps into multiple circuits to meet the needs of different scenes, the second floor space area using small angle lamps to avoid direct light shining on the wall, so that the space has more depth, in order to ensure the overall tone, we also do a key lighting in each area, but also use a large number of flexible light strips, outlining the wall shape, making the The space has more sense of technology.
Project Innovation/Need
As a project with many different functions, we have adopted a zoning approach, for example: the large open play area uses direct light to achieve the effect of flux; in the eight planets area, we use the light emitted by the planetary props themselves, without setting other direct or indirect light sources to ensure that the space is close to the state of space, in addition to the ground arrangement of some starlight buried lights, on the one hand to simulate the effect of the stars, on the other hand, invariably divided the scope of the pedestrian passage; we also use a large number of light strips to outline the decorative outline, taking into account the emphasis on the sense of hierarchy while also providing a certain amount of basic lighting.
Design Challenge
The interior solution of this case was handled by a Singaporean company, the interior deepening unit was a Chinese company, and many props were deepened by a German company, which brought us certain challenges in cross-border multi-party cooperation. The construction period of this project became very long due to the epidemic. During this period, the A party also constantly had new ideas for the project's constant changes, we constantly updated the drawings for the effect, especially on the nodes of lighting installation to communicate repeatedly in many aspects to ensure the best presentation of the effect. We also spent a lot of energy in the lamp sample testing stage, because of the limited budget of the party, we repeatedly communicate with the party and suppliers about the problems, some lamps and lanterns sent samples as many as 5 times to meet the final effect.
Sustainability
We have made all-round illumination calculations for the whole space and formulated detailed illumination standards for the subsequent opening of the same type of chain stores. We use normal specifications in the selection of lamps and lanterns to avoid the difficulties caused by the later maintenance.
Lighting Design - International
This award celebrates creative and innovative lighting design or effects in indoor or outdoor spaces.
More Details